Laserfiche WebLink
• FACILITIES (Continued) <br /> <br />Remove Pond Recl. Equip. _ <br />466 <br /> Seal Drill Noles 8 Monitor Yells = 10,306 <br /> Rip Explosive Storage 8 Cow Camp = 3,315 <br /> Construct Y.C. 100-Year Diversion = 22,025 <br /> Reclaim Light Use and Access Roads = 104,209 <br /> Dredge Sediment Ponds = 759,111 <br /> Remove Boneyard Debris = 14,405 <br /> Total Futilities = f 965,179 <br /> MISCELLANEOUS ITEMS <br /> Light Plants = f 66,370 <br /> Repair Rills and Maintain Roads = 44,440 <br /> Dispose of Hazardous Yaste = 6,250 <br /> Haul Coal and Slack Piles to Pit = 798 <br /> Haul/Reclaim Landf arm Areas = 1,200 <br /> Total Miscellaneous = f 118,998 <br />• TOTAL DIRECT COSTS = 53,890,296 <br />INDIRECT COSTS <br />Mobilization end Demobilization <br />(5X of Direct Costs) = S 194,515 <br />Engineering Redesign Fee <br />(3.9X of Direct Costs) = 157,722 <br />Contractor Profit and Overhead <br />(10X of Direct Costs) = 389,029 <br />Reclamation Management Fee <br />(4.OX of Direct Costs) = 155,612 <br />TOTAL INDIRECT COSTS = S 890.878 <br />TOTAL RECLAMATION LIABILITY = 54.781.174 <br />The Division of Minerals and Geology cur r/ently holds 717,673,859 in reclamation bonds for <br />the Seneca 11 Mine. Of that, 510, 782, 12Y applies to Permit No. C-80-005. As shown above, <br />only the 74,781,174 is necessary to reclaim the entire mine site. Therefore, the current <br />bond held is adequate. <br />13-59 Revised 09/09/94 <br />