Laserfiche WebLink
COST SUMMARY <br />DIRECT LOSiS <br />BACKFIILING AND GRADING ([et. 1) <br />Highwall Reduction (Blasting) <br /> _ <br />- S 111,073 <br />Doze Highwall Material <br /> = 472,083 <br />Doze Adjacent Two Spoils <br /> = 279,717 <br />Crade Back Two Spoils <br /> = 66,445 <br />Grade Joe Lake Fill <br /> = 53,375 <br />Grade Lower Yadge <br /> = 54,085 <br />Grade Cow Cemp <br /> = 65,252 <br />Grade wolf Creek Dountlrain <br /> = 26,061 <br />Grade lower Wolf Creek <br /> = 744,231 <br />total RackfilLing $ Grading _ <br />- 57, 276,65d <br />TOPSOIL REPLACEMENT <br />Nine Area <br />Total Topsoil Replacement <br /> ,S 888,502 <br />REYECETATION <br />Mine Area <br />total Revegeta[ion <br /> = S 640, 967 <br />FACILITIES <br />Haul Roads <br /> = S 72, 735 <br />Permanent Roads <br /> = 88,858 <br />Sediment Ponds <br /> = 17,452 <br />Reclaim Facilities Area <br /> = 79,827 <br />Structure Demolition <br /> = 355,565 <br />Deadhead Routes <br /> = 71,473 <br />Reclaim Truck wash Ponds <br /> = 1,890 <br />Crade Diversion Ditches <br /> = 3,332 <br />Remove Pumping Station at Nedge Impoundment <br /> = <br />655 <br />Remove Dewatering Devices at Ponds D04 end 008 <br />= <br /> 551 <br />Reclaim Stocktenks <br /> = 77,953 <br />Remove Flumes <br />= 557 <br /> ~~ <br />73-38 Revised D9/09/94 <br />