Laserfiche WebLink
3-20 <br />• 3.6 RECLAMATION SCHEDULE AND COSTS <br />It is difficult to determine a reclamation schedule due to the following factors: <br />~ Variables associated with operations in the, as yet undefined graben. <br />Uncertainties as to the need for modification or extended projections of the mine <br />plan. <br />~ The affected areas are limited to a small space making reclamation prior to <br />abandonment impossible. <br />Upon completion of mining, reclamation work will be promptly started. Revegetation should <br />be complete within one and one-half years following initiation. Costs associated with the <br />reclamation procedure are listed in Table 3.7-1. For these cost estimates, it has been assumed <br />that 1.5 acres will be broadcast seeded and mulched with netting. The remaining 5.4 acres will <br />• be revegetated via drill seeding and non-netted mulching. <br />• <br />A~ Volume 1 4.29.96 <br />