My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102902
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102902
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:37 PM
Creation date
11/24/2007 9:23:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006046
IBM Index Class Name
Permit File
Doc Date
5/17/2006
Doc Name
112c permit application
From
Silt Sand & Gravel LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Banks and Gesso. LLC <br />Mining in Phase 2 will start with stripping and stockpiling of topsoil and overburden as <br />needed. Mining will start in the southern part of the area and move northward. <br />After reserves have been depleted in Phase 2 and prior to the depletion of the Phase 3A <br />mining reserve, the processing area located in Phase 3A will be moved to the location in <br />Phase 3B, as shown on the Mining Plan Map. <br />Mining in Phase 3A will start with stripping and stockpiling of topsoil and overburden, as <br />needed, in areas to be mined. Mining in this area will begin on the northeast side and <br />move southwest. Reclamation will begin within one year of completing mining in this <br />sub-phase. Mining in Phase 36 will proceed in the same manner as other areas, with <br />the general direction of mining from south to north. <br />The reserve underlying the Phase 36 processing area will be the final area to be mined. <br />The plant located in this area will be moved off-site, allowing for the efficient recovery of <br />all sand and gravel reserves within the permit area. The remainder of pit run material <br />recovered in Phase 3B will be processed off-site. <br />Minino Slopes <br />Assuming limited amounts of overburden are available for backfilling, the operator will <br />mine the property creating slopes of, on average, 2.5H:1 V. <br />The operator will not be limited to mining to approximate reclamation slopes in the event <br />that backfill material is generated in sufficient quantities to facilitate recovery of <br />construction materials within the cross-section of the slope to the pit bottom. Mining to <br />near-vertical slopes will be permitted where backfill materials are available for <br />reasonably contemporaneous placement along mined slopes. <br />Final sculpting of reclamation slopes at 3:1/2:1, in accordance with Construction <br />Materials Rule 3.1.5(7), may occur at the time of mining or with concurrent reclamation. <br />Grand River Park Project 05021 <br />Silt Sand & Gravel LLC 9 May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.