My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102882
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:36 PM
Creation date
11/24/2007 9:22:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
CHAPTER M ABANDONMENT AND RECLAMATION PLAN
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eh ESPEY, HUSTON & ASSOCIATES, INC. <br />Z.3 BACKFII.LING <br />The mine cut will be backfilled and the bench regraded to cross sections <br />shown on Exhibit M-1. Pre-existing spoil piles located on the site will be used in the <br />backfilling and regrading process to return the area to contours and slopes specified <br />below. <br />A total of ~$#a5 of material comprising the mine bench azea <br />will be pushed upslope with bulldozers to achieve the cross sections shown on Exhibit <br />M-1. The slopes (as shown on Exhibit M-1) will generally be 2.5:1 (horizontal: <br />vertical) but locally may range as high as 2:1. By comparison, natural slopes in the <br />azea (exclusive of cuts related to previous mining) range up to Z:1 and steeper in the <br />immediate vicinity. Proposed cross sections were made at 100-foot intervals. <br />Earthwork to achieve final contours will involve several steps. In no case will a <br />slope exceed the steepness of the natural slopes in the azea (2h:lv), so stability of <br />the fill azeas is assured. Spoil in fill azeas will be placed in 6-inch horizontal lifts <br />• and compacted to 95% modified Proctor before the next fill is complete. A dozer <br />will be used to accomplish this task. When the layers become too nazrow to grade <br />along the contour, the dozer will move up and down the hill to blend the lifts. Fill <br />material from the excavated azeas will be stockpiled and moved by a loader to azeas <br />requiring fill. A registered engineer will supervise eazth moving work to ensure <br />compliance with the regulations set forth in 30 CFR 817.101. Regraded slopes will <br />be checked with a clinometer to verify slopes shown in Exhibit M-1. <br />Final grading will be along the contour unless this jeopardizes the safety <br />of the equipment and its operator. Plans for work along such contours will have to <br />be approved by MSHA. Grading, preparation and placement will be conducted in a <br />manner which minimizes erosion and provides a surface for replacement of topsoil <br />to minimize slippage. <br />• M-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.