Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________I______________________________________________________________ <br />________________________________________________________________________ <br />Subtotal (K ): <br />L. DRILL HOLE/MONITORING NE LL SEALING <br />Task No.l Task Description ~ Cost (E) <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (E) <br />4 ~ Demoliti onDispose of 5'x10'x10'mass a E0.22/c.f. ~ E710 <br />5 ~ Seeding As per attached worksheet. ~ E1,967 <br />Fencing <br />6 Mob/Demob As per attached worksheet. ~ <br />__________________________________________ E635 <br />___________ <br />___________________ <br />Subtotal (M): E2,711 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): E4, 739 <br />11. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ <br />____ <br />_ Lost (E) <br />___________ <br />I <br />________I______________________________________________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ E73 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ E73 <br />3. Contractor's Profit........... 10.00% of dir. ~ E474 <br />4. Job Superintendent..Equip. oper. serves as super. <br />__________________________________ <br />___________ <br />___________________________ <br />Subtotal (A ): E621 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E5,360 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description Cost (E) <br />1. ~ Minerals Program Adm S.OOY. of cnt r.~ E268 <br />NET INDIRECT COST PERCENTAGE: 18.767. Subtotal (B ): E268 <br />__________ _ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): ___________ <br />E889 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 55,628 <br />