Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description <br />sheet 3 of 4 <br />Cost (S) <br />________________________________________________________________________ <br />Subtotal (H): <br />I. EAR THNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No. Task Description I Cost (8) <br />Subtotal (I): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Task Description ~ Cost (S) <br />________I_____________________________________________________________, <br />3 ~ Replace an average of 2" depth of topsoil on the ~ 5128 <br />regraded pit slopes. All topsoil available must <br />be replaced. The 2" depth is estimated. <br />________________________________________________________________ <br />Subtotal (J ): 8128 <br />