Laserfiche WebLink
2.01'.5 Permit Term <br />• TCC is submitting this application for a permit term of five years. <br />Prior to the expiration of the fifth year, TCC will request a permit <br />term for an additional five years. <br />2.01.6 Permit Fees <br />As required under this Section of the Colorado Regulations, TCC is <br />herewithin submitting a permit fee of $105.00. There are approximately <br />eight acres within the disturbed area to be permitted for the coal <br />loadout facility. <br />• <br />• <br />2.01-2 <br />