My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102806
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:33 PM
Creation date
11/24/2007 9:16:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Diversion Ditch and Sediment
Section_Exhibit Name
CHAPTER C MINE OPEATION PLAN Appendix A
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• NORTHERN COAL CODIPANY RESPOt7SE TO CMLR JUt7E 15, 1981 ADEQUAC] LETTER <br />2.05.3 Operation Plan <br />(4.01.1(1)) <br />1. The maximum and minimum thickness of coal to be mined in each seam should <br />be specified. <br />Response: The maximum coal to be mined in the Rienau No. 2 and Northern PIo. 1 <br />Mines is 12 feet. The minimum coal which will be mined is 6 feet. These <br />variances will depend upon geologic conditions and are dictated by equipment <br />limitations also. <br />2. Why is mining not planned closer to the projected outcrops and burned <br />areas in each mine? <br />Response: Generally, the outcrop and burned areas contain very low quality <br />coal and these areas also tend to have hazardous roof and room conditions due <br />to lack of structural integrity of the material being mined. Our plan is to <br />take all coal of suitable quality which can be safely mined. It is impossible <br />to project exactly how far any given panel might go to an outcrop due to lack <br />of specific information. Our projections are made on the best information available. <br />• 3. The method of splitting pillars in the room and pillar mining sections <br />is not given. A diagram showing proposed sequence of mining within a pillar <br />should be submitted. <br />Response: During the five year plan we will be splitting no pillars as we <br />anticipate no retreat mining. When Northern submits an additional modification <br />or second five year plan which calls for retreat mining, we will discuss <br />splitting the pillars at that time. <br />4. The applicant dogs not discuss the recovery of main haulage and air course <br />pillars on final retreat. <br />Response: [de will not recover main haulage and air course pillars- <br />5. t7ot applicable - pursuant to April 16th meeting. <br />6. The applicant should fully discuss the reasons why the projected recovery <br />is less than 50 percent in the P seam, the Northern T7o. 3 Ptine and the <br />Rienau No. 2 Mine. <br />Response: The percentage of recovery in the Rienau No. 2 Pline is somewhat less <br />than 50 percent due to the fact that the seam is significantly thicker than the <br />equipment available to mine such a seam. Combined with the steeply dipping <br />nature of the seam and the 12 foot reach of the equipment, the overall recovery <br />is less than 50 percent and cannot be improved significantly. Any efforts to <br />improve the percentage of recovery would result in safety problems. <br />~ 7. No[ applicable - pursuant to April 16th meeting. <br />4 <br />