Laserfiche WebLink
<br />June 27, 1989 <br /> Plan Changes <br />1. Page 1 - Updated Plan date to reflect this submittal. <br />2. Pages 14 and 15 - Clarified sentence concerning left or <br /> right di rection of removal of pillars. <br />3. Page 20 - Renum bered cut sequences to eliminate t wo cuts ~. <br /> numbered 15. <br />9. Page 23 - Remove d coal stumps to the right of lift numbers <br /> 7, 10, 1 7, 22, 19 and 24 to be compatible with similar <br /> mining a s shown on Page 24. <br />S. Page 27 - Added a double row of timbers on each side of <br /> roadway leading to final pushout stump, lift No. 10, placed <br /> at a max imum of 16' apart. <br />6. Page 29 - Added a turn row of timbers to the right side of <br /> lift No. 10. <br />• <br />• <br />~~~t 0~;~~~ Cq~l~ ~. I-I ,.It1~ ~,~ ~'~~ <br />