Laserfiche WebLink
• A. LIST OE ROOF BOLTERS <br />Roof Bolt Model Serial Minimum Load <br />Manufacturer Number Number Carrying Capacity <br />Long Air-DOX LRB-15A 62-585 11,250 <br />Long Air-Dox LRB-15A 62-579 11,250 <br />Lee Norse TD2-93-59E 21310 18,000 <br />Lee Norse TD2-93-59E 21373 18,000 <br />Lee Norse TD2-39-65E 21963 18,000 <br />Lee Norse TD2-39-65E 21979 18,000 <br />B. GENERAL GUIDELINES <br />1. Two safety jacks shall be kept readily available on each <br />operating roof bolter for use when the automated support <br />system becomes unworkable or does not supply adequate <br />protection Eor the roof bolter operator. <br />2. No one will be allowed beyond the last row of permanent <br />support~on side opposite the controls of the roof bolt- <br />er. No one shall proceed beyond the last row of perma- <br />nent support to extend face ventilation devices. <br />• 3. All out-of-date or damaged resin cartridges shall be <br />removed from the underground areas of the mine. <br />9. When an area of unsupported roof exists that may be <br />accessed by two or more entrances, the unsupported area <br />at each of these entrances shall be posted with a read- <br />ily visible warning, oc a physical barrier shall be <br />installed to impede travel beyond permanent support. <br />5. When work, other than examinations as mentioned in Sub- <br />part D 30 CE[i, is being performed inby an opening or <br />unsupported roof the entrance of the opening shall be <br />supported, with at least one row of bolts, posts, or <br />safety jacks on not more than five foot centers across <br />the opening. Roof bolts shall be installed in the <br />opening. Posts or safety jacks shall not be installed <br />in the opening, but installed in the intersection under <br />permanently supported top. <br />6. To obtain access to an inoperable continuous miner under <br />unsupported roof in order to perform mechanical or elec- <br />trical repair, roof supports shall be set until the area <br />between the last row of permanent roof support and the <br />work area of the continuous miner has been supported. <br />All supports shall be placed on not more than five foot <br />• centers. <br />.. .. ~ :J <br />