My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102766
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:32 PM
Creation date
11/24/2007 9:13:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
CHAPTER S MITIGATION SUBSIDENCE CONTROL PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIGURE S-7 <br />M P.IO. BrOX 958I - _•- <br />I IG'@K@f, I.OlOradO . 81641 <br />April 3, 1980 <br />Mr. Aazold M. Smolnikaz <br />Northern Coal Company <br />P. 0. Box 17583 <br />Terminal Annex <br />Deaver, CO 80217 <br />Deaz Mr. Smolnikaz: <br />qq~~ ~ ~ <br />~t ,~_.. <br />fit( APR 07 1980 ~ <br />~ly <br />e <br />F~:r-.ltdL`_R pEVELOPY,EN7 <br />This letter is to acknowledge the fact that White River Electric <br />Association is aware of Northern Coal Company's mining activities <br />• in those azeas as shown on Northern's map MME-8210-08-1/1 dated <br />March 26, 1980. <br />White River Electric also acknowledges that there is a potential <br />for subsidence to occur in these areas, and that the subsidence ' <br />may affect the White River's 69,000 and 7200 volt lines. The areas <br />that will be a££ected are shown by colored portions on the map. <br />Any direct damage that occurs to the structures and lines due to <br />subsidence and that will require repair will be paid for by Northern <br />Coal Company. The lines will be monitored closely by Northern Coal <br />Company during actual subsidence activity and if any problems occur, <br />White River Electric will be notified immediately. <br />Also, a certain section of the line will have to be moved to provide <br />room for the excavation for the P-Seam and J-Seam portals. The <br />design for this will have to be approved by White River Electric, <br />and the costs will have to be paid by Northern Coal Company. <br />Your tr y, <br />e M. Holeyf <br />Manager <br />• JMH/fw <br />5-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.