My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102728
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:31 PM
Creation date
11/24/2007 9:10:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Permit File
Doc Date
2/21/1995
Doc Name
LETTER FAXED 2-17-95
From
COLINA ORO MOLINO INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLiNA ORO MOLINO, INC. <br />P. O. BOX 17304 <br />BOULDER CO 90308-0304 <br />Februarv 17, 1995 <br />William C. York-Feirn <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver CO 60203 <br />Re: Meeting February <br />Adequacy Review <br />Gold Hill Mill. <br />Dear Mr. York-Feirn: <br />16. 1995 <br />File No. M-94-117 <br />A the meeting to review Com. Inc.'s written response (submitted <br />to you in duplicate on February 16. 1995) to the Adequacy Items <br />enumerated in your letter dated January 4, 1995. you requested <br />clarification and/or additional details on the following: <br />EXHIBIT B - paragraph 5 <br />The applicant agrees to sample all four (4) monitoring <br />points as required by the permit <M-63-lvli on a quarterly <br />basis to include the water temperature during the sampling <br />process and to monitor water levels as well as all <br />information as is present on the last sampling analysis <br />sheet. <br />EXHIBIT C - paragraph 3 & 4 <br />Com, Inc. will provide DMG the ore characteristics before <br />placing tailings in the tailings impoundment. <br />EXHIBIT D - paragraph 5 <br />Com, Inc. will continue ground water monitoring on a <br />quarterly basis for 1 year after reclamation. After 1 year <br />the DMG will review the results to determine if further <br />monitoring is needed. Com, Inc. will maintain a water <br />sampling log. <br />Com, Inc. agrees to retain a registered professional consulting <br />engineer who is experienced and qualified in the realm of <br />tailings impoundment ponds. Com, lnc, will arrange a meeting <br />between the DMG and Com, Inc.'s consulting engineer to coordinate <br />tactics. The additional items discussed with you during the <br />meeting of February 16, 1995, and your phone conversation of <br />February 17, 1995, with Tim Hartley will be addressed after said <br />meeting. <br />Sincerely, e-- <br />Thames Hartley <br />Com, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.