Laserfiche WebLink
EXHIBIT D - RECLAMATION BOND CACULATION (conintued) <br />TAILINGS IMPOUNDMENT br RECLAMATION 2.3 Acres <br />Site Regrading & Lime Raking <br />4 hours @ 590/hour 380 <br />Lime 8 tons @ 880/ton µ8O. <br />Capillary Barrier Rock <br />6^thickness 556 yds of 1 1/2"rock 5648. <br />Rock Grading 2 hr @ 390/hr 180. <br />Top Soil 363 yd @ 4^ thickness 2901. <br />Trucking Rock & Soil 4578. <br />Top Soil Grading 2 hr @ f90.hr. 18U. <br />Seeding, mulching & fertilizing <br />2.3 acres @ 3550iacre 1375. <br />S'UB TOTAL 315.900. <br />(NOTE: Semi-dump truck 352/hr - 25 ton load <br />estimate 2 hrs/load. 44 loads @ 3104 = <br />14545. for trucking <br />Purchase 363 yards soil. an additional <br />131 yards from stockpile top soil at site. <br />WYNONA DUMP <br />MILL <br />1.704. <br />2.200. <br />TAILINGS IMPOUNDMENT 15.900 <br />TOTAL 319.604. <br />