Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />NUCLEAR DENSITY TEST RESULTS <br /> <br />Project: Haul Road Y-8 Project No.: 95-2384 Date: 8/10/96 <br />Report No.: 81 <br /> <br />Test <br />Number Loca[ion Depth <br />Elevation Proctor <br />Number Dry <br />Density <br />(pcfl Water <br />Content <br />(%) Actual <br />Compaction Required <br />Compaci~on <br /> Pond 010 <br /> Embankment <br />169 Sta. 1+50. at E. 4' BTE 12 105.5 18.4 96 95 <br /> CL <br />170 Spillway Culvert, 10' ATP 72 105.9 18.9 96 95 <br /> 75'LofECL <br />171 Sta. 3+60. R. of E. 7' BTE 12 105.0 18.4 95 95 <br /> CL <br />• <br />