Laserfiche WebLink
~ III IIIIIIIIIIIII III ~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Namml Resources <br />1713 Sherman 5[., Room 215 <br />Denver, Colorado 80203 <br />Phone (3031866-3557 <br />E,~,x:13o31 B32 aloe <br />May 31, 2001 <br />~~ <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br /> Bill Owens <br />Mr. Charles J. Kuntz governor <br />ashingt <br />on County <br />W Dre6 E. Watcher <br />< <br />c <br />150 A$h St. EMeCUrivC Director <br />Akron <br />CO 80720 Michael B. Long <br />, Division Director <br />Re: Shook Gravel Pit 1, M-2001-012, Permit Issuance -County Construction Material Operation <br />Dear Mr. Kuntz: <br />On May 31, 2001 the Division of Minerals and Geology found Washington County to have satisfied the <br />applicable requirements of C.R.S. 34-32.5-101 et sue. for obtaining a mining and reclamation permit. Therefore, <br />a permit is being issued. Two signed originals of the permit have been executed. We have kept one copy for our <br />files and are enclosing one copy for your use. It is your responsibility to comply with all of the terms of the <br />permit. <br />1. All of the original apphcation materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of all of <br />these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the <br />permit and the permit application at the mining operation as a reference for operating personnel, to help ensure <br />compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consuhing the Construction Materials Rules and Regulations <br />andlor contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, May 31st, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $688.00. Please consult the Ad, Rules and Regulations, and your <br />permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please contact the Division. <br />~cer <br />MICHAEL B. LONG ~.~2v ~L <br />Division Director <br />MBL/ESC/bdc <br />Enclosure <br />