Laserfiche WebLink
<br />t• <br />UPDATED OUTLINE OF <br />APPROXIMATE TOTAL COST EVALUATION <br />• <br />GEOTECHNICAL AND ENGINEERING SERVICES <br />FOR ORCHARD VALLEY MINE COAL MINH <br />Phese 1 - GeotechnIcal Overview <br />Merrick dk Company (see Merrick proposal) <br />Geo-Hydro Consulting, Inc. (see Geo-Hydro proposal) <br />Phase 1 Total <br />Phase 2 - DrlllIng, Collection of Data, Analyses <br />Merrick dk Company <br />Geo-Hydro Consulting, Inc. <br />Drilling contractor <br />Laboratory (soil $ rock testing) <br />Laboratory (chemical testing) <br />Surveying <br />(see Merrick proposal) <br />(see Geo-Hydro proposal) <br />(proposal required from soils <br />(proposal required from soils <br />(proposal required from lab) <br />firm) <br />firm) <br />(Assumed oy Owner) <br />Phase 2 Total <br />• <br />Phase 3 - Deta~7ed Engineering Design' <br />Merrick dk Company (see Merrick proposal) <br />Geo-Hydro Consulting, Inc. (see Geo-Hydro proposal) <br />Phase 3 Total' <br />PROJECT TOTAL <br />'Cost for Phase 3 is very approgmate at this date. <br />These costs shown are subject to change and will be updated <br />after the completion of Phase 2. <br /> <br />