ITEMIZATION OF ESTIMATED COSTS <br />• <br />MERRICK $ COMPANY <br />(Updated 7-22-81) <br />Phase 1 - Geotechnical Overview <br />Meetings with MLRB <br />Project Manager, <br />Project Engineer, <br />Site Visit and Review <br />Project Manager, <br />Project Engineer, <br />D. Frazier 12 hrs. @ <br />M. Glidden 12 hrs. @ <br />D. Frazier 12 hrs. @ <br />M. Glidden 12 hrs. @ <br />Travel Expenses <br />Subsistence <br />Phase 2 -Collection of Data, Analyses, Recommendations on <br />Reclamation Procedures <br />Meetings with Owner (2 assumed) <br />Project Manager, D. Frazier 16 hrs. @ <br />Project Engineer, M. Glidden 16 hrs. @ <br /> <br />Travel Expenses <br />Data Collection/Setting up Computer Models for Drainage do Stab[lity <br />(4 critical x-sections for reclaimed facilities assumed) <br />Project Engineer 48 hrs. @ <br />Project Manager 8 hrs. @ <br />Computer Runs (16 assumed) L.S. <br />Analysis of Results 16 hrs. @ S <br />Review Report by Geo-Hydro 8 hrs. @ ; <br />Drafting 20 hrs. @ ; <br />Reproduction (20 copies) <br />Miscellaneous <br />~-r <br />• <br />Phase 3 -Detailed En ineeri Desi • <br />assumed 7 to 8 drawings <br />Design, Project Engineer 184 hrs. @ S <br />Drafting/Technician 320 hrs. @ S <br />Coordination, Project Manager 80 hrs. @ S <br />Writing Specifications, Engineer 40 hrs. @ S <br />Typing 40 hrs. @ ;. <br />Reproduction (5 sets of bluelines a nd 5 sets of specs) <br />Computer Analysis <br />Miscellaneous <br />•Cost for Phase 3 is very approximate at this date. These costs shown are <br />subject to change and will be updated after the completion of Phase 2. <br />