My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102397
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102397
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:18 PM
Creation date
11/24/2007 8:46:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
6/30/2003
Doc Name
pages 2-1 to 2-57d
Section_Exhibit Name
2.0 Environmental Resources - 2.1 Climatology & 2.2 Air Quality
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• GENEFIAL TERMS AND CONDITIONS: (IMPORTANT! READ ITEMS 5.6.7 AND 8) <br />1 ~ This permit is issued in reliance upon the accuracy and completeness of information suppliedby the applicant and <br />is conditioned upon condict of the activity, or construction, installation and operation of the source, in accordance <br />with this information and with representations made by the applicant or applicant's agents. It is valid only for the <br />equipment and operations or activity specifically identified on the permit. <br />2. Unless specifically stated otherwise, the general and specific conditions contained in this permithave been determined <br />by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.51711a1. C.R.S. <br />3. Each and every condition of this permit is a material part hereof and is not sever~le. Any challenge to or appeal of, <br />a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be <br />deemed denied ab inifio. This permit may be revoked at any time prior to final approval by the Air Pollution Control <br />Division (APCD) on grounds set forth in the Colorado Air Duality Control Act and regulations of the Air Quality Contrb <br />Commission IADCCI, including failure to meet any express term or condition of the permit. If the Division denies a <br />permit, condition:; imposed upon a permit are contested by the applicant, or the Division revokes a permit, the <br />applicant or owner or operator of a source may request a hearing before the AQCC for review of the Division's action <br />4. This permit and any required attachments must be retained and made available for inspection upon request at the <br />location set forth herein. With respect to a portable source which is moved to a new location, a copy of the <br />Relocation Notice (required by law to be submitte] to the APCD whenever a portable source is relocated) should be <br />attached to this permit. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation <br />No. 3, Part B, Section III.B. upon a request for transfer of ownership and the submittal of a revised APEN and the <br />required fee. <br />5. Issuance (initial approval) of an emission permit does not provide "final" authority for this aaivity or operation of this <br />source. Final approval of the permit must be secured from the APCD in writingin accordance with the provisions <br />of 25-7-114.5 C.F;.S. and AQCC Regulation No. 3, Part B, Section IV.H. Final approval cannot be granted until the <br />operation or activity commences and has been verified by the APCD as conforming in all respects with the condfions <br />of the permit. If the APCD so determines, it will provide written documentation of such final approval, which does <br />• constitute "final" authority to operate. CampGance with the permit conditions must be demonsVafed wiM1n 181 days <br />after commencement of operation. <br />6. THIS PERMIT AUTOMATICALLY EXPIRES IF you 11) do not commence construction or operation within 18 months <br />after either the dare of issuance of this permit or the date on which such construction or activity was scheduled to <br />commence as set forth in the permit, whichever is later; 121 discontinue construction for a period of 18 months or <br />more; or 131 do not complete construction within a reasonable time of the estimated completion date. EMensions <br />of the expiration elate may be granted by the APCD upon a showing of good cause by the permittee. <br />7. YOU MUST notify the APCD at least thirty days Ifdteen days for portable sources) prior to commencement of the <br />permitted operation or activity. Failure to do so is a violation of Section 25-7-114.511211a1, C.R.S. and AQCC <br />Regulation No. 3, Part B, Section IV.H.1., and can result in the revocation of the permit. You must demonstrate <br />compliance wish the permit conditions within 180 days after commencement of operation as stated in condition 5. <br />8. Section 25-7-114.712), C.R.S. requires that all sources required tofile an Air Pollution Emission Notice (APEN) must <br />pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, <br />the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee <br />billing will terminate. <br />9. Violation of the terms of a permit or of the provisions of the Colorado Air Quality Control Act or the <br />regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections <br />25-7-115 (enforcement), -121 linjunctionsl, -122 (civil penalties), -122.1 (criminal penaltiesl, C.R.S. <br />• Figure 2.2-3. Emission Permit for Utility Ash and Sludge Disposal. <br />2-57a <br />c~I.~~~3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.