Laserfiche WebLink
GEtJERAL TER1~4S AiJD COivDITIONS (Ih,POZT!.NT! READ ITEhIS i A1~D 8) <br />7. This permit is issued in reliance upon the accuract- and completeness of information <br />supplied by the applicant and is conditioned upon construction, installation end operation <br />in accordance with this information and with representations made by the applicant or its <br />agents. <br />2. This permit is valid only for the equipment and operations specifically identified herein <br />3. Each and every condition of this permit is a material part hereof and is not severable. Any <br />challenge to, or appeal ot, a condition hereof shall constitute a rejection of the Entire permit <br />and upon such occurrence this permit shall be deemed denied ab initio. <br />4.. This permit may be revoked at any time prior to final approval by the Air Pollution Control <br />Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and <br />regulations of the Air Quality Control Commission (AOCC), including failure to meet any <br />express term or condition of the permit. <br />5. This. permit must be retained and made available for inspection upon request at the <br />location set forth herein. With respect to a portable source which is moved to a new <br />location. a copy of the revised Air Pollutant Emissions Notice (APEN) (required by law to <br />be submitted to the APCD whenever a portable source is relocated) should be attached to <br />this permit. The permit may be reissued to a new owner as provided in Section III B. of <br />AOCC Regulation No. 3 upon transfer of ownership. <br />6. Initial approval of an emission permit does not provide "final" authority for operation o1 this <br />source. Final approval of the permit must be secured from the APCD in writing in <br />• accordance with_the provisions of C.R.S. 1973. Section 25-7-114(4)(j)and Section IV.H. of <br />AOCC Regulation No. 3. Final approval cannot tie granted "until construction ~scompleted <br />and operation and construction have been verified by the APCD as conforming in all <br />respects with the conditidns of the initial approval permit. <br />7. You AQUST riotify the APCD at least thirty days (lifteen days Tor portable sources) prior to <br />commencement of the permitted operation or activity. Failure to do so is a violation of <br />CRS 1973. Section 25-7-11x(4)((1 and Regulation No. 3., Section iV.H.1.,and can result in <br />the revocation of.the initial approw~l permit. <br />8~: ^Yuu tJ~UST obtain final approval within six rnoiiths of the cdmmencement:ot operation as <br />`.:-that term is defined by the. AOCC Farfure~o obtain final_approval. will result in~ the <br />v_:revocation of me initial approval ~elmit= r= ~ _ - - _ - <br />9. It the APCD determines that the terms and conditions of the initial approval permit have <br />been satisfied, ttie APCD will issue a final approval permit, which does constitute "final" <br />authority to operate as discussed in Paragraph 6 above. <br />10. Violation of the terms of a final approval permit or of the provisions of the Colorado Air <br />Quality Control Act or the regulations of the AOCC may result in administrative. civil or <br />criminal enforcement actions under C.R.S t973: Sections 25-7-115 (enforcement), 25-7- <br />121 (injunctions), 25-7-122 (civil penalties) and 25-1-114 (criminal penalties). <br />11 Unless specit~cally stated otherwise. the general and special conditions contained m <br />Ihis permit have been determined by the APCD to be necessary to assure compliance <br />. with the provisions of C.R.S. 1973, 25-7-114(4)(8) and, as such, shall be enforceable <br />under the provisions of C.R.S. 1973, 25-7-115 after final approval of the permit has been <br />granted. <br />Figure 2.2-1. l~isaion Permit for Surface Mining for Coal. <br />2-SSa <br />Ff$1~'~?7 <br />