My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102386
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:18 PM
Creation date
11/24/2007 8:46:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999050
IBM Index Class Name
Permit File
Doc Date
9/6/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />Agenry or organization name :Division OI Mrnera/s And Geology <br />Task w ~ 001 State : Cprorado ~ PertnNOb a : M-99-050 <br />Date. 09/173.'99 Counry.Lanmer Abbreviation:none <br />User: ACS Site :7imnafh Connell Pa Filename:M080~007 <br /> <br />Permit or other lob action :New application <br />cask descnption :Rip shale lrom pit floor to construct pond liner <br /> <br />HOURLY EQUIPMENT COST Basic machine:Ca109N/1995) Horsepower: 370 <br />Blade type : Semr-Universal <br />Attachment no. 1 : ROPS Cab Shlh hasis : 7 per day <br />Attachment no. 2: 1-shank ripper <br /> Utilization % Cost data source : (CRG) <br />Opsl Breakdown : Ownership cosUhour: $41.85 NA <br />Operating cosVhour: $et.00 100 <br />RRper op. cosVhour: $11.13 100 <br />Operator msUhour: $23.72 NA <br />Total unit cosl/hour: $157.09 Total fleet cosUhr: $157.09 <br />Selected estimating method : $e15l111C <br />Seismic <br />methotl: 731,200 CCY Load factor: OH75 Bank volume : 114,800 BCY <br />Area <br />methotl : NA Acres Pip depth (NI: NA volume : NA BCV or CCY <br /> Source of quantity Wke~oN :369 s./ bacMdl x-sec. ®9600'pil pedmerer <br /> <br /> Source of material load lector :load factor for shale <br />HOURLY PR ODUCTION <br /> Seismic meMOtl ~ Malenal seismic velocity: 4,500 lest per secpntl <br /> Unadjusted houry production : I,173.77 BCY or CCYmr <br /> Area method : Average ripping depth per pass : NA lest <br /> Average ripping width per pass : NA lest <br /> Average ripping length per pass : NA leer <br /> Average velonry of machine : NA leer per minute <br /> Avemge machine maneuver time /pass : NA minutes <br /> Houdy production per unit area : NA acres per hour <br /> Unadjustetl hourly producton : NA BCY or CCY/hr <br /> Correnion tenors ~ Unadjustetl houry production : 1.113.73 BCV or CCYrtIr <br /> Site altitude : 4,800 teal <br /> AlGtutle atllu5lment: 1.00 (Cat HB/ <br /> Job eRicienry lector : 0.83 (1 shAVday) <br /> Net lob correction : O.H3 multiplier <br /> Atllusted hourly unit protluaion : 92d d0 BCV or CCY/hr <br /> Atllusted hourly Ileet pmtluction : 924.40 BCY or CCY/hr <br /> <br />JOB TIME A ND COST <br /> Fleet size: I Dazer(s) Total job time : 124.19 Hours <br /> Unit cost: 50.170 /LCV Total job cost : $19,509 <br />
The URL can be used to link to this page
Your browser does not support the video tag.