Laserfiche WebLink
2. ~ Contractor's Performance Bond 1.550% of dir. ~ 56.659 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ f42.962 <br />4. ~ Job Superintendent.. ~ <br />Subtotal (A): f56,281 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 d P): f485.903 <br />B. DMG PROJECT AOMI NI STRATION EXPENSES <br />Item No.~ Item Description ~ Cost (f) <br />~ ~ <br />1. ~ Minerals Program Adn 5.00% of cntr.~ f24.295 <br />NET INDIRECT COST PERCENT/~E: 18.76% Subtotal (B): f24,295 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): (80.576 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): f510,198 <br />