Laserfiche WebLink
<br /> <br />Subtotal (G): <br />RECLAMATION COST SUMIARY mnt'd <br />H. EARTHNORK <br />Task No.~ <br />STREAM CHANNEL RECONSTRUCTION <br />Task Description <br />sheet 3 of 4 <br />~ Cost (f) <br />----"--' <br />Subtotal (H): <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />5 ~ Install ground water interceptor system <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />319.860 <br />Subtotal (I): 319,860 <br />~ Cost (f) <br />6 ~ Replace topsoil on 35 acre pond periphery <br />7 ~ Scarify prior to seeding <br />f47,063 <br />f3 ,500 <br />