Laserfiche WebLink
<br /> <br />Subtotal (C ): <br />RECLAMATION COS7 SUMMARY cont'd <br />D. EARTHWORK - FILL LOMPACfION <br />Task No.~ Task Description <br />~ compaction cost included in backfilling cost <br />sheet 2 of 4 <br />Cost (f) <br />Subtotal (D): <br />E. EARTHWORK RIPPING <br />Task No.~ Task Description <br />1 ~ Rip shele from pit floor to construct pond lirer <br />Cost (f) <br />519,509 <br />Subtotal (E): f19.509 <br />F. EARTHWORK <br />Task No.~ <br />ROAD RECLAlIATION <br />Task Description <br />~ Cost (f) <br />Subtotal (F) <br />G. EARTHWORK - FINISH GRADING <br />Task No.~ Task Description ~ Cost (f) <br />