Laserfiche WebLink
1 <br />ERHIBIT E (Cont'd) <br />' deficiency (about 8 to 15 lbs. additional nitrogen per acre). Irri- <br />gation would aid the development rate, but is not recommended because <br />' of the high probability of excessive die-off after water is removed. <br />' Reclamation Timetable <br />The reclamation phases listed in the following table may be <br />' correlated to map Exhibits D-1 and 1?. The phases correspond to the <br />mining stages and are numbered accordingly. These are estimates <br />' only, and variations may occur. <br />' <br />Total Acres <br />Partial <br />Final Grade & <br /> Phase Years Acres + Road Slope Backfill Resoil or Rip Revegetate <br />' 0 13.23 0 2.88 4.90 9.78 9.78 <br /> I Part 1 4- 6 8.22 0 2.76 1.53 6.29 6.29 <br /> I Part 2 7.61 0 2.75 2.78 7.53 7.53 <br /> II Part 1 10.68 0 3.53 3.97 9.50 9.5D <br /> II Part 2 4- 6 11.23 0 4.22 1.T1 7.33 7.33 <br /> II Part 3 7.94 0 2.78 1.33 6.11 6.11 <br />' III <br />IV 4- <br />4- 6 <br />6 12.46 <br />13.98 0 <br />0 4.60 <br />5.07 6.30 <br />5.89 12.46 <br />12.98 12.46 <br />12.98 <br /> V 4- 6 14.74 0 6.32 4.60 12.92 12.92 <br /> VI 4- 6 17.05 0 6.26 4.48 12.74 12.74 <br /> A 8-12 6.40 0 2.28 2.32 6.40 6.40 <br /> Area 1 3.87 0 2.32 1.55 3.87 3.87 <br /> Area 2 10.65 0 5.70 3.80 9.50 9.50 <br /> Area 3 4.30 0 2.58 1.72 4.30 4.30 <br />' 141.76 0 54.05 4~ 12~7T 121.71 <br />Note 1: A maximum of 2 acres are added to the mined areas <br />to cover the amount of area necessary to final grade, <br />resoil or rip, because of stockpiles and/or roads in <br />' the average phase or part phase. <br />Note 2: It is not expected that areas 1, 2 or 3 will be <br />' mined, but should clay be unexpectedly encountered <br />in these stages, the probable amount of acres involved <br />in reclamation has been estimated. <br /> <br />- 21 - <br />