Laserfiche WebLink
• • PART III <br />Page 10 of I 1 <br />Permit No. LO-0033863 <br />• ER REQUIREMENTS <br />Additional Bypassing Requirements <br />If, for other reasons, a partial or complete bypass is considered necessary, <br />a request for such bypass shall be submitted to the State Water Quality <br />Cohtrol Division and to the Environmental Protection Agency at least sixty <br />(60) days prior to the proposed bypass. If the proposed bypass is.judged <br />acceptable to the State Water Quality Control Division and by the Environmental <br />Protection Agency, the bypass will be allowed subject to limitations imposed <br />by the State Water Quality Control Division and the Environmental Protection <br />Agency. <br />If, after review and consideration, the proposed is determined to be _~ <br />unacceptable by the State Water Quality Control Division and the Environmental <br />Protection Agency, or if limitations imposed on an approved bypass ar-e <br />violated, such bypass shall be considered a violation of this permit; and <br />the fact that application was made, or that a partial bypass was approved, <br />shall not be defense to any action brought thereunder. <br />Testing <br />Test procedures shall conform with those procedures specified in the Federal <br />Register, Volume 38, Number 199, October 16, 1973. These procedures involve <br />( • the use of the latest edition of one of the following references: <br />1. "Standard Methods for the Examination of Water and Waste Water", <br />2. "ASTM", Annual Book of Standards, Part 23, Water, Atmosphere Analysis, <br />3. "Methods for Chemical Analysis of Waters and Wastes", Environmental <br />Protection Agency. <br />• <br />