My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE102112
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE102112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:56:08 PM
Creation date
11/24/2007 8:31:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004030
IBM Index Class Name
Permit File
Doc Date
5/27/2004
Doc Name
Adequacy Ltr
From
DMG
To
T Bone Stone Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Date : 27-May-2004 Permit or job no.: M-2004030 <br />User: TAS Abbreviation: none <br />Filename: M030-000 <br />Agency or organization name :Division Of Minerals & Geology <br />Permit or job action :Final Reclamation ~ ~ aa'nl(L <br />Site :T Bone Stone Quarry <br />State :Colorado <br />County :Boulder <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. + TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Backfill 48,390 cv stockoiled overburden to 3:1 slopes NA 1 1.0 $14,511 <br />002 Respread 1611 cy stockpiled topsoil NA 1 1.0 $158 <br />_003_ Revegetate 3 acres NA 1 1.0 $1,050 <br />004 rEquipment Mob/Demob NA 1 1.0 $750 <br />• inUUdes inNation tailor adjustment of <br />OVERHEAD AND PROFIT <br />NA <br />Liability insurance <br />Performance bond <br />Job supedntendent <br />Profit <br /> <br />1.55 <br />1.05 <br />2.00 <br />10.00 <br />SUBTOTALS :L a. <br />TOTAL DIRECT COST <br />_% of direct total = $255 <br />of direct total = $173 <br />hrs'...$/hr.• $35.00 total = $70 <br />%ofdirecf total= $1,647 <br />'assume net hours = 50% or task hours TOTAL O & P = $2,145 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $18,614 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contracUbid preparation : 4.25 %ofcntr. NA total = $791 <br />Reclamation management and/or administration : 5.00 %ofcntr. NA total = $931 <br />CONTINGENCY- NA' NA total = NA <br />conGnpencies aarounted Por at task level TOTAL INDIRECT COST = $3,867 <br />TOTAL BOND AMOUNT (direct + Indirect) _ $20,336 <br />
The URL can be used to link to this page
Your browser does not support the video tag.