Laserfiche WebLink
<br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80207 <br />Phone (7071 888-7581 <br />FAX (7031 866-3589 <br />Response to Reclamation Permit Application Consideration <br />DATE: February 28, 1997 <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division I Office; District l Water Commissioner <br />FROM: Megan Sullivan, E.I.T. <br />RE: Bijou Clay Pit, File No. M-97-007 <br />Operator: The Denver Brick Co. <br />Contact: Wayne Spence, The Denver Brick Co., Box 1600, f t~' L .~ ~~9~ <br />Castle Rock, CO, 80104110, (303) 688-6951 <br />Section I I, Twp 8 S, Rng 62 W, 6th P.M., Elbert County <br />o pF rye ~Sp ~ pp ~~o~ [ ~ L \o <br />Ne <br />. !r# <br />~C-~ ~ <br />Rny Romer <br />Gncrna <br />lames 5. Lochhcad <br />E,tt'ufive Duttlnr <br />Hal O. Srmpxsn <br />Slmc LnRincer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other: . <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then obtain <br />a waiver of objection from all well owners with wells within 600 fee[ of the permit area or request a <br />hearing before the State Engineer. <br />® Other: The proposed diversion of storm runoff into a pond may have potential impact on existing <br />water rights near the project location. A water right or plan of augmentation may be required before <br />storm runoff can be diverted andlor impounded. Applicant should contact the Designated Basins <br />Branch of this office prior to initiating any diversions and/or impoundment of water. <br />COMMENTS: <br />