Steamboat North Concrete Plant <br />GL 851 <br />SPCC Plan <br />112.8 (c)(6) <br />Lafazge shall implement the integrity-testing protocols presented in Attachment E for <br />bulk storage containers and ancillary equipment. All aboveground bulk storage <br />containers for fuels, oils or oil products shall be included in the integrity-testing program. <br />The facility does not have any piping that is subject to integrity testing requirements. <br />Integrity testing shall be performed on a regular schedule, and following all material <br />repairs or modifications. Appropriate repairs shall be undertaken whenever a tank or <br />other equipment fails an integrity test. Records of all integrity testing shall be kept with <br />this Plan. Visual inspections are performed regularly according to the procedures, and <br />include inspection of tank supports and foundations. Inspections aze recorded on a <br />monthly basis and are maintained for 3 years. <br />112.8 (c)(7) <br />There aze no internal heating coils at this facility that contain oil. <br />] 12.8 (cl(8) <br />AST 1 is equipped with adirect-reading level gauge and 90% overfill alarm. Venting <br />capacity is suitable for the anticipated fill and withdrawal rates. The gauges are tested in <br />accordance with Attachment B. <br />112.8 (c)(81(i) & (iv) <br />Fuel AST 1 is equipped with high level alarms and clock gages. <br />112.8 (c)(9) <br />The facility does not have an effluent treatment system. <br />112.8 (c)(10) <br />Fuel leaks, which result in a loss of fuel From tanks, will be promptly corrected and <br />cleaned. <br />112.8 (c)(I1) <br />The only mobile bulk storage associated with the facility are the 55-gallon drums and the <br />fuel cells on the concrete trucks and loaders. All of these containers are position or <br />stored overnight in an area that will prevent a discharge to navigable waters. <br />40 CFR 112.8 (d) FACILITY TRANSFER OPERATIONS, PUMPING, AND <br />FACILITY PROCESS <br />112.8 (d) (1) <br />The facility does not have buried piping. <br />112.8 (d)(21 <br />Pipelines not in service or on standby for an extended period (over 3 months) are capped <br />or blank flanged and mazked as to their origin. <br />16 <br />