Laserfiche WebLink
• • <br /> XHIBIT E (Cont'd) <br />I <br /> contain complete details and progression of mining stages and <br />' reclamation phases. <br /> Stage P is the acreage that will be disturbed by Suburbans <br /> plant operations. There will be approximately 4.14 acres dis- <br />' turbed for the crushing plant haul road and scale. Over the life <br /> of the mine, the crushing plant and/or scale may be moved to as <br />' many as six locations on the property. As the plant is moved <br />' so the ground it stands on can be mined, that amount of acreage <br /> will be left undisturbed in Stage P to properly balance the land <br /> disturbed at any given time during operations. There will be <br /> another 4.61 acres + disturbed in a life-of-the-mine location <br /> for Suburban's concrete batch plant. Stage P will be counted as <br /> disturbed over the entire life of the mine. <br /> <br /> Suburban will attempt to complete grading, reshaping, seeding, <br />' mulching and fertilizing within one year of the completion of <br /> each mining stage. <br />' Planting, mulching and fertilizing will occur in the fall of <br /> each year whenever possible. If fall planting is not possible, <br />1 ill <br />l <br />t <br />il 1 <br />d M <br />15 i <br />t b <br />A <br />h <br />t <br />ti <br /> we w <br />p <br />an <br />e <br />ween <br />pr <br />an <br />n eac <br />revege <br />a <br />on <br />ay <br /> year. During the two remaining years of a reclamation phase, <br /> reclamation progress will be monitored and remedial work will <br />I, be performed where necessary. <br />' Reclamation Standards. Grading will create a topography <br />appropriate to the final land use. Initial mining methods and <br />' backfilling into the lakes will create irregular shorelines <br /> <br />- 13 - <br /> <br />