My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101532
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:46 PM
Creation date
11/24/2007 8:01:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SHRUB ESTABLISHMENT STUDIES AND MONITORING
Section_Exhibit Name
TAB 13 APPENDIX 13-10
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOPSOIL DEPTH & SHRUB ESTABLISHMENT STUDY <br />Project Manager: Dave Ianson, PhD. <br />Methods. BNG Consultants•will determine the effectiveness of establishing woody shrubs on <br />different topsoil depths. Seneca II Mine will identify and prepare a study site with a minimum <br />of two different application rates of topsoil. BNG Consultants will develop and implement a <br />randomized and replicated system of permanent belt tr~ttsects on the site. The monitoring <br />system will be designed to provide unbiased results for statistical analysis. Variables to be <br />measured include: 1) Survival; 2) Vigor; and 3) Rooting Depths. The study site will be <br />monitored in August on a yeazly basis for a three yeaz period. A status report will follow each <br />monitoring period with preliminary results and recormendations. At the termination of the <br />study, data will be statistically analyzed and a final report submitted identifying the probable <br />response of woody shrub establishment to reduced topsoil application. Best technology practices <br />identified from the study will be incorporated into the reclamation plan. <br />Estimated Start Date <br />Annual Monitoring <br />Estimated Date of Completion <br />September 1995 <br />August 1996,'97,'98 <br />October 1998 ,~ <br />MICROBIAL POPULATION STUDY <br />Project Manager:. Dave Ianson, PhD. <br />Methods. Microbial sampling will be conducted on three separate types of sites: 1) Direct <br />hauled topsoil sites; 2) Stock-piled topsoil sites; and 3) Reclaimed lands greater than 5 yeazs in <br />age. The study will focus on. determining the rates of shrub inoculation on these sites. BNG <br />staff mycorrhizast will define indicator microorganisms and sample for those appropriate species <br />on the separate soil types. Plant materials will be destructively sampled as needed and soil <br />samples will be taken. At BNG Laboratories, organisms will be isolated and identified. A report <br />on the relative degree of colonization between sites and amongst plant species will be submitted <br />to Seneca II Mine along, with appropriate recommendations for future soil moving and <br />inoculation activities. <br />Estimated Start Date <br />Estimated Date of Completion <br />September 1995 <br />December 1995 ~ <br />13-10-2 Revised 10-6-95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.