My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101529
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:46 PM
Creation date
11/24/2007 8:01:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004013
IBM Index Class Name
Permit File
Doc Date
2/26/2004
Doc Name
Permit Application
From
Trans Colorado Concrete a Division of Pete Lien & Sons Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Banks and Gesso, LLC <br />Exhibit L -Reclamation Costs <br />Estimated reclamation costs are based on the maximum disturbed acreage (80 acres) at <br />any given time, including plant and stockpile areas. We assume, for purposes of <br />assuming worst-case reclamation costs, that augmentation water has not been obtained <br />and reclamation would require backfilling the pit (30 acres) to approximate original grade <br />and grading and topsoiling the plant area (30 acres) and settling pond and stockpile <br />areas (20 acres). <br />Item Cost Total <br />Backfill Pit and Settling Ponds To <br />Approx. Original Grade (30 acres) $ 150,000 <br />Topsoil Replacement (80 acres, 12" <br />inches deep) 129,040 yd3 $0.40 /yd3 $ 51,616 <br />Grading 80 acres $200 /acre $ 16,000 <br />Seeding/Planting 80 acres $400 /acre $ 32,000 <br />Direct Cost $ 249,616 <br />Insurance, Performance Bond and <br />Profit (15%) $ 37,442 <br />Total Cost $ 287,058 <br />St. Barbara Sand and Gravel Mine 03028 <br />Trans Colorado Concrete z7 February 19, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.