Laserfiche WebLink
Banks and Gesso, LLC <br />Table G-1: Water Demand <br />Demand Item Daily Requirement Annual Source <br /> Requirement <br />Drinking Water Drinking water for - 313 days per bottled water <br /> employees year of operation <br />Sanitary None None portable toilets <br />Dust Control 10,000 gallons per day for 2,600,000 wells and/or <br /> dust control on roads and gallons per year ground water <br /> plant (rest is wet process) (dewatering) <br />Aggregate Washing - - 400,000 gallons per day 104,000,000 wells and/or <br />325,000 tons per year gallons per year ground water <br />produced (dewatering) <br />Augmentation Water N/A - 37-55 acre-feet yet to be <br /> first 2 years determined <br />Wetlands <br />The U.S. Army Corps of Engineers has documented through a field inspection, that there <br />are no wetlands other than immediately adjacent to the river bank within the permit <br />boundary. Wetlands adjacent to the river will be protected by the 300 foot river set back. <br />St. Barbara Sand and Gravel Mine 03028 <br />Trans Colorado Concrete 20 February 19, 2004 <br />