Laserfiche WebLink
r• • <br />Table 1.4J. Rspradinp Pits page 5 <br />Gatlin Pit <br /> Push Productivity Correction Productivity Dozer Unit Cost Total <br />Cross Section Cubic Yards Distance (Icylhr) Factor (Icylhr) Hours (SR1r) Cost(S) <br />N400,800 <br /> 7616 136 2080 0.80 1664 5 251.10 1,149 <br />N400,925 <br /> 149074 197 1400 0.80 1120 133 251.10 33,422 <br />N401,925 <br /> 93750 190 1425 0.80 1140 82 251.10 20,650 <br />N402,300 <br /> 181481 156 1800 0.80 1440 126 251.10 31,646 <br />N403,100 <br /> 171111 144 1900 0.80 1520 113 251.10 28,267 <br />N403,900 <br /> 161481 149 1850 0.80 1460 123 251.10 30,790 <br />N404,700 <br /> 98333 182 1625 0.80 1300 76 251.10 18,993 <br />N405,100 <br /> 139892 197 1425 0.80 1140 123 251.10 30,813 <br />N405,615 <br /> <br />Total 1022738 170 1667 0.80 1334 561 251.10 195,731 <br /> <br />u, <br />n <br />3 <br />D <br />~n <br />tD <br />00 <br />• <br />eoaoac <br />ryrasr <br />