Laserfiche WebLink
• <br /> Table 1.4J. Renradinp Piq page 4 <br /> <br /> Flintlock Pd <br /> Push Productivity Correction Productivity Dozer Unit Cost Total <br /> Crone Sactlon Cubic Yards Distance (Ity/hr) Factor (Icylhr) Hours (Sfir) Cost(S) <br /> N402,600 <br /> 44695 244 1100 O.BO 880 51 251.10 12,753 <br /> N402,700 <br /> 350000 231 1150 O.BO 920 380 251.10 95,527 <br /> N403,700 <br /> 364556 245 1100 O.BO B80 414 251.10 104,023 <br /> N404,700 <br /> 390759 244 1100 0.80 880 444 251.10 111,500 <br /> N405,700 <br /> 374907 202 1410 0.80 1128 332 251.10 83,457 <br /> N406,700 <br /> 554444 279 1000 0.80 800 693 251.10 174,026 <br /> N407,700 <br /> 39669 300 950 0.80 760 52 251.10 13,113 <br /> N407,775 <br /> <br />_ Total 2119050 245 1134 0.80 907 1622 251.10 594,399 <br />w <br />~n East Flintlock Pit <br /> Push Productivity Correction Productivity Dozer Unit Coft Total <br /> Cross Section Cubic Yards Distance (Icylhr) Factor (Icy/hr) Hours (Sfir) Cost(S) <br /> N404,730 <br /> 149694 235 1150 0.80 920 163 251.10 40,857 <br /> N405,000 <br /> 405185 269 1060 0.80 848 47B 251.10 119,979 <br /> N405.800 <br /> 342963 275 1000 O BO B00 429 251.10 107,648 <br /> N406.600 <br /> 299259 268 1020 0 80 B16 367 251.10 92,088 <br /> Md07A00 <br /> 149565 265 1020 0.80 816 163 251.10 46,024 <br /> N401,)25 <br /> <br />D Total 1J46GG6 266 tp41 0.80 B37 1069 251.10 406 <br />595 <br /> , <br />N <br />W <br />(fJ <br />cD <br />CD <br />eoxoa~ <br />~a~o+~ <br />