Laserfiche WebLink
<br />Table 1.d•2. Summary of rprada <osb <br />Adlwted <br />Pusn Productivity Corra<UOn Productviry Dozer Unit Cost Totai <br />Pit Cubic Yartls Distance (Icy/hr) Factor (Icy/hr) Hours (3/hr) Cost(a) <br />Nn Disposal 1,818,19] 363 791 0.74 579 2,853 251.10 716,316 <br />DrE Prt-dozer 1,551.185 255 1181 0.60 945 1,723 251.10 432.64] <br />DrE P4 -scrapers 2.869.048 ne 1512 1.00 1512 1898 1555.06 2,946,467 <br />FPrt 2,119,050 245 1,134 080 907 1,622 251.10 594,399 <br />East F Prt 1,346,666 266 1,041 0.80 B33 1,069 251.10 406,595 <br />G PB 1,022,738 170 1667 0.80 1334 581 251.10 195,731 <br />Total 10,524,680 266 1231 080 885 9746 5,294,150 <br />Drill and Blast Cubic Yards Benching 3 Drilling 3 Blasting 3 Total $ <br />N D/E Pi[ 379,900 7,634 18,300 41,800 68,734 <br />Ash Dump 831.400 16.707 42,100 91,500 150,307 <br />Total 1,211,300 24,341 61,400 133,300 219,041 <br />Roads-Ripping 2,397,507 Na 1500 0.66 990 2,422 190.85 462,186 <br />~' Roads-Ragrade 2,996,883 80 1900 0.66 1254 2,390 181.77 434,405 <br />Impoundments 263,890 285 721 0.43 310 851 181.77 154,642 <br />Diversions 20,253 13,206 <br />Finish Grading' 670 120.16 80,488 <br />Total Ragrade $6,658,118 <br />' Cat 16G, 2210.1 acres, 3.3 acres per hour <br />3 <br />N <br />W <br />cA <br />f0 <br />/p <br /> <br />eaxowc <br />rvrasr <br />