Laserfiche WebLink
<br /> <br />Activity Quantity Units Unit Cost Cost <br />G. Lake shore final grade seed and mulch <br />1. Replace topsoil - 12" on 3 acres <br />2. Seed and mulch <br />4,840 <br />3 <br />CY <br />Acres <br />$1.25 <br />$800 <br />$6,050 <br />$2,400 <br />Disturbance Costs $173,392 <br />Contractor Mobilization (8%) $13 871 <br />Overhead (18.5%) $32,077 <br />Administration (5%) $8,670 <br />Total $228,010 <br />Disrurbed acreage - 45 acres <br />Financial Warrantee per Acre $5,067 <br />Hall-Irwin Mining Proposaljor the Shores -NLRB //1 Permit 38 <br />