My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101499
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101499
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:45 PM
Creation date
11/24/2007 8:00:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Permit File
Doc Date
2/24/1998
Doc Name
PERMIT APPLICATION
From
HALL-IRWIN CONSTRUCTION CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT L -RECLAMATION COST <br />We have selected the phase of the mining that includes the largest area that will be disturbed atone <br />time to calculate the potential reclamation liability for the Division of Minerals and Geology. This <br />will occur during the beginning of phase 7. The dewatering trench will be at its maximum size, the <br />processing area and haul roads will be disturbed, and shoreline reclamation will be in process for <br />phase 6. It is anticipated that these disturbances will total approximately 45 acres. Concurrent <br />reclamation will have taken place on the shoreline for phases l through 5 and the bottom of the pond <br />will begin to fill once dewatering has been stopped. <br />Activity Quantity Units Unit Cost Cost <br />A. Stripped overburden and topsoil- <br />approximately ~ acres of disturbance <br />I. Replace overburden 40,333 CY $1.25 $50,416 <br />2. Replace 6" of topsoil 4,033 CY $1.25 $5,041 <br />3. Seed and mulch 5 Acres $800 $4,000 <br />B. Active mining area -will fill with water <br />C. Dewatering trench <br />1. Dozer soil into trench 4,000 CY $.55 $8,148 <br />2. Replace l2" topsoil 1,032 CY $1.25 $1,290 <br />3. Seed and mulch .64 Acres $800 $512 <br />D. Roads - to remain for future development <br />A. Processing area -equipment is portable <br />and would be removed by the operator <br />1. Move surge piles into settling pond 1,000 CY $1.25 $1,250 <br />2. Remove concrete pad far wash plant l5 CY $65 $975 <br />3. Remove concrete pad for asphalt plant 60 CY $65 $3,900 <br />4. Remove concrete pad for concrete 37 CY $65 $2,405 <br />plant <br />~. Demolish and remove shop 40,000 CF $.OS $2,000 <br />6. Remove concrete footings for office 8 CY $65 $520 <br />7. Remove concrete base for scale 10 CY $65 $650 <br />8. Scarify ground 25 Acres $150 $3,750 <br />9. Spread 12"topsoil 40,333 CY $1.25 $50,416 <br />10. Seed and mulch 25 Acres $800 $20,000 <br />F. Settling pond <br />1. Place overburden, 12" on 2 acres 3,227 CY $1.25 $4,034 <br />2. Place topsoil 12" on 2 acres 3,227 CY $1.25 $4,034 <br />3. Seed and mulch 2 Acres $800 $1,b00 <br />Ha((-lrwin Mining Proposa(jor the Shores - ~LILRB 111 Permit 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.