<br />TABLE 4 <br />TRUCK TRAFFIC AND HAUL ROUTES <br />Mining trucks do not leave <br /> mining site <br />Concrete Batch Plant ready mix trucks, 106 WCR 9 314 to WCR 24 <br /> other cement trucks, (70% proceeds west, <br /> tandem 30% east) <br />Asphalt Batch Plant belly dump, dump 80 WCR 9 3/4 to WCR 24 <br /> truck (70% proceeds west, <br /> 30% east) <br />Recycling Plant end dump, dump 10 WCR 9 3!4 to WCR 24 <br /> truck (70% proceeds west, <br /> 30% east) <br />Sand and Gravel Sales semis, tandems, 110 WCR 9 3/4 to WCR 24 <br /> belly dumps, misc. (70% proceeds west, <br />1Based on 6 days a week, 52 weeks a yeaz <br />Proposal for the Shores - MLRB l11 Permil 18 <br />