Laserfiche WebLink
i <br />WECC abandoned the facility with the maximum area stripped (10 <br />acres), has been used to calculate the covering plus retopsoiling <br />costs. <br />Wildlife Shrub Clusters (purchase of tublings 1 <br />plus labor to plant shrubs) (11 acres @ $766/acre) _ $8,426 <br />Estimated reclamation costs = $97960 <br />10% contingency X96 <br />$107,756 <br />I <br />J <br />WECC recently increased its reclamation bond by $750,000 to cover <br />the cost of hauling refuse material presently stockpiled at the U. _) <br />i <br />Steel Laydown area to the permanent disposal site, reclamation of <br />this refuse disposal site as well as other additions/revision to the-~ <br />Mt. Gunnison operations which have resulted in increases to the <br />reclamation costs of the mine. The present bond is now at <br />$2,702,700. Reclamation costs, including this revised cost for the <br />permanent refuse disposal site are estimated at $2,702,513. ~ <br /> <br /> <br />-39- <br />