Laserfiche WebLink
<br />Revegetation of entire 40 acre disposal site (includes perimeter <br />ditches) <br />Ripping <br />Seedbed Preparation and Fertilization <br />Drill Seeding <br />Mulching <br />40 acres x $1,278/acre = <br />Cost/acre <br />$ 98 <br />180 <br />600 <br />400 <br />$1,278 <br />$51,120 <br />Covering a 10 acre area (most disturbed area at any one time) with <br />s6" of non-toxic cover and 18" of topsoil. Haulage and distribution <br />S costs estimated in Table 4.8.1.C of the M and R Plan for this <br />` project have been recalculated based on an average 1000 foot one-way <br />haulage from the stockpile to the area to be reclaimed. <br />4' of soil x 43,560 ft.2 x _Ld3 = 645s yd3 soil/acre <br />27 ft.3 <br />Scraper costs = $0.54/yd.3 soil x 6453 yd.3 soil/acre <br />_ $3485/acre <br />$3485/acre x 10 acres (final stage= $"x4,850 <br />Placement of seedbed quality material on all completed stages of the <br />pile, except for the last stage, will be done when stripping soil <br />for the next stage of pile construction. However, for purposes of <br />• reclamation bond calculation, the worst case situation, i.e., that <br />_' -38- <br />