Laserfiche WebLink
~~ <br />Based upon the above discussion, topography, pile configura- <br />lion and prudent engineering practice, initially five lateral <br />underdrains are planned to be constructed at the approximate <br />locations shown on Drawing No. MG-R-C-002. <br />•,I <br />r~ <br />L <br />25 <br />