Laserfiche WebLink
TABLE OF CONTENTS • <br />1.0 - INTRODUCTION Pa e <br />1.1 Background 1 <br />1.2 Purpose 1 <br />1.3 Refuse Disposal Facility 2 <br />~~ <br />_ 2.0 - SITE CONDITIONS 3 <br />j 3.0 - REFUSE PILE DEVELOPMENT PLAN 4 <br />3.1 Access Road Construction 5 <br />3.2 Clearing and Stripping 5 <br />. 3.3 Surface Drainage Channels 7 <br />3.4 Underdrains 5 • <br />~ 3.5 Refuse Placement 11 <br /> <br />4.0 - HYDR OLOGY AND HYDRAULICS ~ <br />~- 13 <br />4.1 Precipitation Event 13 <br />4.2 Runoff Curve Number 13 <br />4.3 Methodology to Compute Peak Discharge 14 <br />4.4 Perimeter Channels 14 <br />4.5 Temporary Collection Channels 15 <br />4.6 Bench Drainage 16 <br />- 4.7 Temporary Collection Channels on Refuse Pile 16 <br />4.8 Gut let Pipe 17 <br />5.0 - GEOTECHNICAL AND PILE STABILITY 18 <br />5.1 Additional Testing on Refuse Materials 18 <br />