Laserfiche WebLink
• GEOTECHNICAL (Continued) <br />s. <br /> <br />Section 7.0, pp. 31-33 <br />Due to inaccessible site conditions, a <br />field geotechnical investigation was not <br />possible during the course of this report <br />preparation. Roadway sections may need to <br />be modified during the construction phase <br />depending upon field conditions. <br />4. Section 5.4, pp. 24-25 and Appendix A <br />A detailed discussion of the underdrain <br />system has been presented in Section 5.4. <br />Based upon the topography and <br />computations, initially five lateral <br />underdrains will be constructed as shown <br />on Drawing No. MG-R-C-002. <br />5. Inspection will be made in accordance with <br />Rule 4.09.1 of the CMLRD's Regulations for <br />Coal Mining. <br />6. Section 6.1 pp. 26-30 <br />Piezometers and surface monuments will be <br />installed as shown on drawing No. MG-R-C- <br />001. <br />7. Section 8.2, pp. 36-39 <br /> <br />