Laserfiche WebLink
control measures or revegetation be needed in the interim to stabilize the area <br />prior to re-mining those areas? <br />6.3.4 Exhibit D -Reclamation Plan <br />Will the existing mining disturbance affect the reclamation plan? Will the County <br />reclaim the entire disturbed area after mining, or only those areas that have been <br />re-disturbed by the County during permitted operations? Is there sufficient <br />topsoil available or reclamation of the pre-permitted disturbance? What will the <br />post mine topography look like? <br />Thank you for your prompt response in this matter. Please feel free to contact me with <br />any questions or concerns <br />Si~~~y~ <br />Chns Rowe Z~~ <br />Environmental Protection Specialist <br />cc: Tony Waldron - DRMS <br />