Laserfiche WebLink
<br /> <br /> <br />.Reclamation Costs (Exhibit L) <br />1. Reclamation cost estimates are based on the assumption that only 18" of <br />overburden and-3".of topsoil will be redistributed. These estimates <br />should be based on the maximum amount of material which may be ck ~1 <br />stockpiled on site in the event of a bond forfeiture, not the <br />. - operator's final reclamation scenario. Please revise as appropriate. <br />-2.~ -This estimate does not include any provision for mobilization/ <br />demobilization of equipment, removal of plant facilities and buildings, ? <br />~- and other indirect costs. Please revise the estimate to include these ~~~(GJ,~,~ <br />items. I would recommend that you increase your estimate by the actual ~ <br />anticipated costs of removing plant facilities and buildings plus a 15% "~ '^ <br />_ allowance for indirect costs. ~,,,,,,,. t ~, <br />rrcor+e+'+-Q~, <br />5}L ~' <br />,,~I~uL <br />sh}z¢• <br />--~ t~ nr ~ ~ji850.W <br />i <br /> <br />8745E/scg <br />r ~U~~I~id <br />~~u~l~c <br />-3- <br />