Laserfiche WebLink
<br />TABLE 1 <br />Reclamation Seed Niature <br />i <br />Percent <br />Common Name Variety of Mix Lbs./Acre <br />Hard Fescue Durar 30 2.4 <br />' Streambank Sodar 25 5.5 <br />Wheatgrass <br />Pubescent Luna 25 7.0 <br />Wheatg;rass <br />Indian Ne2par 20 5.0 <br />Ricegrass <br />100 19.9 <br />7. Mulch <br />' Approximately one ton of straw mulch per acre will be applied <br />manually to the areas to be reclaimed. <br />' 8. Structures to Remain After Reclamation <br />All existing structures will remain after reclamation. All <br />trash, scrap equipment, ore stockpiles and other non-essential <br />items will be removed. All areas will be graded to the <br />reclamation contours in committed to in Part 2 of this <br />' Reclamation Section. <br />9. Reclamation of the Tailings Impoundments <br />Upon germination of this project the four tailings impoundments <br />will be contoured so that incident precipitation will not <br />accumulate. Any available soil materials will be used to cover <br />' the ta3ilings surface. The procedures outlined in Parts 2 through <br />7 of this reclamation section will be followed while reclaiming <br />the ta3ilings impoundments. <br />10. financial Warranty <br />' CCCM will commit to the maximum $5,000.00 financial warranty. <br /> <br /> <br />' D 2 <br />