Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : X05 <br />Date : 08/31/2005 <br />User : JRS <br />State :Colorado <br />County :Moffat <br />Site :Trapper Mine <br />Permitfjob# : C-1981-010 <br />Abbreviation :none <br />Filename : C010.X05 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Notice of Intent X-2005-189-06 <br />Task description :Replace TOp50%/ flOm $tOCkplle t0 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Basic machine :Cat D8R Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />Ownership cosUhour : $48.82 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $31.78 NA <br />Total unit cosUhour : $146.70 Total fleet cosUhour <br />$146.70 <br />Initial Swell Loose <br />volume : 300 BCY factor : 1.250 volume : 375 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shiff/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7, 600 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.41 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 345.91 LCY/hr <br /> Adjusted fleet production : 345.91 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 1.08 Hours <br />Unit cost : $0.424 /LCY Total job cost : $159 <br />Roads <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />