Laserfiche WebLink
CIRCES Cost Estimatin~l Software <br />PROJECT IDENTIFICATION <br />Task # : X04 <br />Date : 08/31/2005 <br />User: JRS <br />State :Colorado PermiUjob# : C-1981-010 <br />County :Moffat Abbreviation :none <br />Site :Trapper Mine Filename :C010.X04 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Notice of Intent X-2000.189-06 <br />Task description :Replace Topsoil from Stoc <br />HOURLY EQUIPMENT COST <br />to Three Drill Pads <br />Basic machine :Cat DSR Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.82 NA <br /> Operating cost hour : $66.09 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $31.78 NA <br /> Total unit cost/hour : $146.70 Total fleet cosUhour : $148.70 <br /> <br />:: _.. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,500 BCY factor : 1.250 volume : 1,875 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 85 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 951.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (post Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,600 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.41 <br />Weight description <br />Earth -Dry packed <br />Adjusted unit production : 385.95 LCY/hr <br />Adjusted fleet production : 385.95 LCY/hr <br />JOB 71ME AND COST <br />Fleet size : 1 Dozers) Total job time : 4.86 Hours <br />Unit cost : $0.380 /LCY Total job cost : $713 <br />Horsepower: 310 <br />