Laserfiche WebLink
earth costs rd maim <br />• COLOWYO LOAL COMPANY <br />2000 MIO TERM REVIEW - TR - 51 <br />EARTHWORK COSTS <br />ROAD MAINTENANCE EOUIPMEfuT <br />Haul Routes <br />West PII ^minnne Cut <br />14G Mobryradar <br />5000 Gal. H2O Trunk <br />Subblal All Equlpmanl <br /> <br />• <br />REVISED FEBRUARY 15, 2001 <br />Lcofa Bank PmduGOn Equipment Talal <br />CuDi[Yetda CYblc Yards Rate EquipmaM Coab Cmb <br />(Lry) (Bry) (Brydv.) Hours (3/hr.) (f) RemarW <br />1.25 1 <br />705,500 2N,400 2,989 81.77 (59.60 f4,890 assume 12.594 afauaper0ma <br />B1.7Y f4B.58 (3,972 assume same tlme ea mobr9reder above <br />305.500 2M,400 761 f54.1B fa,662 <br />~_n <br />